site stats

Section 01300

WebSECTION 06410 - MILLWORK 06410-3 1.3.1 Comply with applicable provisions for Premium Grade as defined in the latest edition of the AWI Quality Standards for all materials, fabrication and workmanship for all work of this Section. 1.3.2 All work of this Section shall be performed by skilled mechanics of thetrade and shall be of the Webwith Section XXXXX – Sewer Line Cleaning prior to post-installation inspection. 3.02 TELEVISION SURVEY . A. Prior to application of the chemical grout and again after application of the chemical grout, a television survey of each grouted pipeline shall be performed in accordance with Section XXXXX – Sanitary Sewer Television Inspection.

MILLWORK PART ONE: GENERAL - HBA.com

WebThe Contractor shall submit drawings and other data to the Engineer per Section 01300. Drawings and other data shall be complete, prepared especially for this Project. Manufacturer’s ... Shall be provided according to Section 11250-Precast Concrete Tank System 2.03 FLOW EQUALIZATION . Package Plant Specifications 11250-7 Jan 2013 A. … WebC. Section 07210 – Building Insulation: Insulation of walls and ceiling. D. Section 15145 – Plumbing Piping: Floor drains. ... 16155 – Equipment Wiring: Connections to building electrical service. 1.3 SUBMITTALS A. Submit under provisions of Section 01300. B. Product Data: Manufacturer’s descriptive literature for saunas and components ... brad taylor musc facilities https://venuschemicalcenter.com

SECTION XXXXX CHEMICAL GROUTING - Gulf Coast Underground

Web5.10 Other manufacturers desiring approval comply with Section 01600. 5.11 Fasteners: 5.11.1 Roof fasteners shall be approved by the metal roof manufacturer. 5.11.1.1 Use compatible fasteners for all applications. Any exposed fasteners shall … WebEIM01300 - Employment income: work-related training: provision by third parties - HMRC internal manual - GOV.UK. Home. HMRC internal manual. WebSection 07411 – Membrane Roof Panels: Coordination of roof edge protection installations. Section 07610 – Sheet Metal Roofing. ... Submit under provisions of Section 01300. Product Data: Manufacturer’s data sheets on each product to be used, including: Preparation instructions and recommendations. brad hope

SECTION 01300 - RECORD DRAWINGS AND SUBMITTALS

Category:Stromberg GFRP Specifications - Stromberg Architectural

Tags:Section 01300

Section 01300

Blueprints, Lvl II Lesson 4 Flashcards Quizlet

WebA. Submit under provisions of Section 01300. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. ... Section 01600. 2.2 TRENCH DRAINS A. Product: #4 EconoDrain 4.5 inch (114 mm) Trench Drain Forming System as ... WebA. The following shall be submitted in compliance with Section 01300: 1. The CONTRACTOR shall comply with the provisions for “Shoring and Bracing Drawings” in Section 6705 of the California Labor Code. 2. The CONTRACTOR, prior to beginning any trench or structure excavation 5 feet deep or over shall submit to the DISTRICT and shall be

Section 01300

Did you know?

WebSECTION INCLUDES ** NOTE TO SPECIFIER ** Delete items below not required for project. A. Carpet tile. 1.2: RELATED SECTIONS ** NOTE TO SPECIFIER ** Delete any sections below not relevant to this project; add others as required. A. Section 03300 - Cast-In-Place Concrete. 1.3: SUBMITTALS : A. Submit under provisions of Section 01300. B. Web01300 - 1 SECTION 01300 ADMINISTRATIVE REQUIREMENTS 1 GENERAL 1.1 SECTION INCLUDES A. Coordination and project conditions. B. Preconstruction meeting. C. Site mobilization meeting. D. Progress meetings. E. Pre-installation meetings. F. Cutting and patching. G. Special procedures. 1.2 COORDINATION AND PROJECT CONDITIONS

WebSECTION 01300 - SUBMITTALS. PART 1 - GENERAL. 1.1 A. SUMMARY This Section includes certain administrative and procedural requirements for shop drawings, coordination drawings, fire protection working plans, schedules, samples and certain other quality assurance submittals. This section does not include requirements for the following … Web1. Submit manufacturers engineering data and installation instructions under provisions of Section [01300] [01340]. B. Shop Drawings 1. Submit shop drawings and product data under provisions of Section [01300] [01340]. 2. Indicate component details, materials, finishes, connection and joining methods, and the relationship to adjoining work. C ...

WebGet your Safety Plan Ready for your Employees' Site-Specific Projects to ensure quick action will be taken during an emergency. Our Free Site Specific Health and Safety Plan Template was Created by Industry Experts and is Editable in our Free Online Editor Tool. WebSECTION 01300 - SUBMITTALS 01300-4 (2 copies) containing: a. Date b. Project title and number c. Suppliers name and address d. Title or description of that submitted e. Number of copies f. Notification of deviations from Contract Documents, if any g. Other pertinent data END OF SECTION

WebSECTION 01300 - SUBMITTALS 01300-3 . 1.3.1 Submit samples of sufficient size and quantity to clearly. illustrate functional characteristics and full range of colors and. patterns. Where sample size has not been specified under individual section submittal instructions, sample size shall be 8" x 11" (200 mm x 280 mm) (A4).

WebCOMMISSIONING SECTION 01 91 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 SECTION INCLUDES A. Equipment and system commissioning, including the following: 1. brad pitt black womenWeb01300-2 1. Provide a space approximately 4" x 5" on the label or beside the title block on Shop Drawings to record the Contractor's review and approval markings and the action taken. 2. Include the following information on the label for processing and recording action taken. a. Project name. b. Date. c. Name and address of Architect. d. brad shaffer indianapolisWebThis section includes the following types of entrance flooring systems: 1. Floor Mats & Frame Assemblies . B. Related Sections: The following sections contain requirements related to this section: 1. Grouting frames into recess; refer to sections 03300 “Cast-In-Place Concrete” and section 03600 “Grout” 2. brad schneider educationWebA. Submit under provisions of Section 01300. B. [Product Data]: Manufacturer’s specifications and installation instructions for all components of each ... All products listed in this section should be installed by a single installer with a minimum of (1) year demonstrated experience in installing products of the same type and scope ... brad pitt in deadpool cameoWebD. Section 06114 - Wood Blocking and Curbing: Rough wood framing and blocking for door opening. E. Section 07900 - Joint Sealers: Perimeter sealant and backup materials. ... A. Submit under provisions of Section 01300. B. Shop Drawings: Indicate plans and elevations including opening dimensions and required tolerances, connection details ... brad wenstrup dc officeWebSECTION 01300 - SUBMITTALS. This is a guidance document with sample specification language intended to be inserted into project specifications on this subject as appropriate to the agency's environmental goals. Certain provisions, where indicated, are required for U.S. federal agency projects. brad stine gods comicWebA. Section 01300 – Administrative Requirements: Coordination and meetings. B. Coordinate the Work with other directly affected sections involving manufacture or fabrication of internal reinforcement for door/frame hardware and recessed items. 1.11 WARRANTY A. Section 01700 – Execution Requirements: Warranties. brad warren cpa